Bibby-Offshore-Our-Experience

Key Projects

2014

  • Total - Total Yell Sound
  • Maersk – DCC Riser Disconnection
  • Allseas - Total Laggan Pipeline Repair
  • Technip – GEAD Survey Support
  • BG – Miskar
  • Centrica - Trees Works
  • ConocoPhillips - EIS Calder / Milliom Structure Inspection
  • EoN - EoN Huntington SCM Changeout
  • BP - Clair SSIV Repair
  • Centrica - IRM Campaign 2014
  • Dong - Dong IRM 2014
  • Maersk - Dumbarton Pipeline Replacement
  • BG - Lomond Caisson Removal
  • Maersk - Dumbarton T and M Flexible Lays
  • ConocoPhillips- Britannia
  • ConocoPhillips - MacCulloch Isolations
  • ConocoPhillips - M11 Joanne
  • BG - Blake DSV Campaign
  • ConocoPhillips - Callanish & Britannia Jumper Installations
  • Shell - Shell Pierce/Brynhild
  • BP - Machar Diagnostics Project
  • TAQA – Cladhan - Conductor Removals
  • Maersk- Maersk 365
  • Talisman - Talisman (270) IRM & Projects 2014
  • Talisman - Arkwright Riser Replacement Project
  • Maersk Olie Og – Tyra
  • Premier Oil – Solan
  • Talisman – Claymore Spur Project
  • ConocoPhillips – Brodgar H3 Tree Remedial Works
  • ConocoPhillips – M12/Judy JRP
  • ConocoPhillips  - Brodgar, M12 & Judy Clamps
  • Endeavour – Renee/Rubie Decommissioning Survey WorksMaersk Janice

2013

  • Maersk Janice
  • HESS - FFFA Phase 5 (V024)
  • E-On – Huntington
  • Maersk – Balloch
  • Fairfield - IRM 2013
  • Maersk – IRM
  • TOTAL - Various IRM (Ellon & Grant/Jura/Islay)
  • Enquest - Thistle and Dons IRM
  • Centrica - EIS & North Sea
  • Maersk – Gryphon
  • ConocoPhillips - M11 Tie-ins
  • Maersk - Tulloch & IRM
  • HESS - IVRR Decommissioning
  • E-On - Johnston K
  • ConocoPhillips – MacCulloch
  • Maersk - Gryphon P36 Tie-Back
  • Maersk - Gryphon GP3 IRM
  • Nexen - Scott and Buzzard
  • Perenco - Leman
  • Centrica - Seven Seas/Ceres (Quasar 13)
  • Centrica - Mallard Squeeze
  • E-On - Hunter Metrology
  • Centrica – IRM
  • Premier Oil - Solan & Brenda Umbilical Jumper Replacement
  • Marathon – Marathon
  • Nexen – IRM
  • Talisman - (270) IRM & Projects 2013
  • Nexen – Blackbird
  • Maersk - GP3 P6/P8

2012

  • TOTAL, Ellon & Grant Nuggets Well Restart
  • Maersk, Lochranza & IRM
  • Ithaca Energy, Athena Field Development
  • TAQA,Otter IRM
  • Talisman, Arkwright Riser Replacement Project
  • Nexen,Ettrick IRM
  • E-On Hunter Flowline Islolation
  • CNR, Lyell
  • Maersk,Janice Riser Reconfiguration
  • Teekay,Banff & Kyle valve isolation and umbilical preservation
  • Perenco, Arthur
  • Maerk Gryphon, area re-instatement programme.
  • HESS, FFFA Decommissioning
  • Allseas Breagh "A" Development
  • Fairfield Energy,IRM 2012
  • Apache Forties
  • ConocoPhillips M10 Tie-Ins
  • E-On Huntington / Johnston K

 

2011

  • NGC Neo Tie-Ins
  • Apache Forties Flex Re-Route Bravo
  • Maersk Olie Og COMB, Svend
  • Perenco Welland & Inde Remedial Works
  • Perenco NW Bell
  • TOTAL Islay
  • Apache Forties Charlie - ROV inspection
  • Apache Forties PL PUP Piece Recovery
  • Maerks Gryphon Repair
  • Fairfield IRM Merlin / Dunlin

 

2010

  • KNOC valve operations
  • PTSC Pearl IRM operations
  • PTSC Topaz IRM operations
  • Maersk Oil UK Gryphon - phase 1
  • ExxonMobil Beryl IRM and decommissioning
  • Maersk Oil UK Gryphon - phase 2
  • CNR Ninian south platform jacket repair (nepsus hyperbaric welding)
  • Acergy/Dana Hudson well tie in and testing
  • PetroCanada well W6 connection tie in and testing
  • Fairfield P3 IRM works - phase 1
  • Silverstone Tristan valve and decommissioning
  • Maersk Oil UK Gryphon GP3 subsea IRM scope DC2 retagging and Lochranza change out
  • Fairfield IRM - phase 2
  • Enquest Don tie ins - phase 1
  • Fairfield Osprey P8 well remedial works
  • Perenco Wellend/Granby/Tristan IRM
  • Enquest Don tie ins - phase 2 and 3

 

2009

  • BP Immortelle construction works offshore Trinidad
  • Nexen Ettrick well tie ins and FPSO installation prep (2 phases)
  • Total Jura area tie ins
  • Eon Rhurgas Rita well methanol flushing
  • Helicopter recovery
  • Apache NS Forties area flexible flowline installation and tie ins
  • Maersk Denmark full Danish North Sea IRM campaign
  • Centrica SNS IRM programme
  • CNR Nepsys wet welding repairs to Ninian platform brace
  • Fairfield Dunlin/Osprey area IRM
  • BP Vietnam IRM programme
  • ExxonMobil Beryl area and Linnie decommissioning work and seasonal IRM
  • Petro-Canada Saxon SA well tie ins
  • Talisman – Full North Sea 365 day DSV support with Bibby Sapphire

 

2008

  • Shell L9 construction project
  • BP Savonette construction works offshore Trinidad
  • BP Noel calm buoy installation offshore Trinidad
  • Saipem/Maersk Halfdan spool installation and testing
  • Technip/Apache Forties tie ins
  • Technip/Oilexco Brenda tie ins
  • Fairfield Dunlin area IRM
  • Talisman – wage caisson riser installation (PM and Engineering)
  • Talisman – full North Sea 365 day DSV support with Bibby Sapphire works including:
      • Buchan Umbilical replacement
      • Tartan/highlander Spool installation & tie ins
      • SCM/Choke and change out at Ross and Tweedsmuir
      • Flexible change out & recovery
      • 13km Power cable installation at Tartan

 

2007

  • Acergy – project support with Bibby Sapphire (120 days)
  • Petro-Canada – Saxon project – EPIC subsea construction
  • Shell – Caravel/L9 – subsea construction project
  • Talisman – full North Sea DSV support with Bibby Sapphire including:
    • Umbilical replacement & J tube pull ins
    • Spool installation & tie Ins
    • Pipeline dewatering
    • Well testing, methanol flushing & diagnostics
    • SCM/Choke & accumulator change out
    • Flexible change out & recovery

 

2006

  • OTSL/Caldive – BP Cannonball Trinidad – spool installation and tie-ins
  • OTSL/Caldive/Stolt – BG/NGC – pipeline repair
  • ExxonMobil Arthur 3 flexible and UMB lay/trench and tie-ins
  • Centrica SNS annual IRM
  • Nexan – IRM
  • Talisman – Claymore UMB replacement and hook-up. Flex. Jumper installation
  • Maersk (Denmark) Bi-annual diving based IRM – up to 30 worksites
  • ConocoPhillips – Tethys Field tie-in

 

2005

  • PetroCanada Guillemott/Clapham IRM
  • CNR Toni, Thelma and Glamis subsea intervention works
  • Saipem Tullow Horne and Wren subsea tie-ins
  • Total North Sea Asset IRM programme (Ph 1)
  • ExxonMobil LP6 tie-ins
  • ConocoPhillips SNS pipeline U/T Works
  • Technip/Shell Corrib structure installation
  • CNR Toni well conversation to gas lift
  • Total IRM (Ph 2)
  • Subsea 7/Venture Kittiwake SAL inspection
  • MOD Tornado jet wreckage recovery
  • Technip – Caledonia Johnston tie-ins

 

2004

  • BP/Gupco, Egypt pipeline repair programme
  • ENI/Kerr McGee/Talisman UWG wellhead decommissioning
  • Apache/Clough Forties Echo riser/subsea construction
  • ExxonMobil Camelot East riser prep works
  • Talisman Piper/Saltire bundle repair & maintenance
  • Talisman Beauly flexible flowline recovery
  • ENI Stirling bypass works
  • BG Blake wellhead repairs
  • ExxonMobil Nevis Central Lewis tie-ins
  • ExxonMobil Buckland “C” Development EPIC