Bibby-Offshore-Our-Experience

Track Record

2017

  •  Apache - SBM Refurbishment
  •  BP - Bruce Centralisers/WAD IR Testing
  •  Engie - Cygnus Fibre Optic Jumper Replacement
  •  Fairfeild Energy - 2017 Diving Support Services
  •  Shell - Gannet Flexible Installation
  •  ConocoPhillips - Callisto & NW Bell Decommissioning Works
  •  Enquest - Kraken 2017 IRM Campaign
  •  Enquest - Scolty Chemical Injection Works
  •  Apache - N11 Disconnect & Reconfiguration Works
  •  ConocoPhillips - Viking Conductor Removal, Satellite Disconnects & Joanne/Jade Riser Inspection
  •  James Fisher/Meygen - Turbine Installation
  •  DONG - Hejre IRM Campaign
  •  CNR - Murchison Decommissioning
  •  TAQA - Eider Bypass Survey Works
  •  Enquest - Thistle CP Works
  •  Centrica - SNS Survey & Inspection Campaign
  •  Chevron - 2017 ROVSV Campaign
  •  Aker BP - Barents Sea Survey Works
  •  Perenco - Mattress Installation
  •  Endeavour - Renee Rubie Tree Survey Works

2016

  • ConocoPhillips Norway - Ekofisk Anode Sled Installation Campaign 2016
  •  CNR - Murchison Decommissioning
  •  BP - ETAP Umbilical & Structure Installation
  •  Engie - Cygnus Spools & Umbilical Installation
  •  Shell - Corrib Subsea Structures Inspection
  •  Enquest - Air Diving and ROV Services 2016
  •  ConocoPhillips - Judy Seawater Lift Caisson Clamp Installation
  •  Shell - Corrib EDU Replacement
  •  James Fisher/Meygen - Turbine Installation
  •  BG - Armada Pre-Decommissioning Survey
  •  Centrica - ROVSV IRM Campaign
  •  ConocoPhillips - ROVSV Pipeline & Structures Inspection Campaign
  •  Marathon - Pipeline & Subsea Structure Inspection Campaign
  •  ConocoPhillips - J-Block Pipeline Inspection Campaign
  •  SDIC - Inch Cape Met Mast Inspection
  •  DONG - IRM Campaign
  •  Fairfield Energy - Dunlin Riser Works
  •  Maersk - Tullich & GP3 IRM
  •  ConocoPhillips - Britannia Manifold Upgrade
  •  ConocoPhillips - Viking Decommissioning
  •  Premier Oil - Solan Field Development Phase 7 & 8
  •  DONG - Hejre IRM Campaign
  •  Maersk - Gryphon P36 Re-routing and Leadon Well Preparation
  •  Total - Ellon Grant Redundancy Recovery
  •  Apache - Bacchus Spool Changeout
  •  Enquest - Alma Galia Production Flexible Reconfiguration
  •  ConocoPhillips - Enochdu Wellhead Choke Changeout
  •  ConocoPhillips - Joanne Umbilical Replacement

2015

  • Total - Ellon Grant Umbilical Installation
  • Premier Oil - Solan Field Development CSV & DSV Installation & Tie-in Works
  • Maersk Olie og Gas - Tyra Replacement Pipeline 36" Caisson Installation, Tie-in &  Precommissioning
  • Endeavour - Renee Rubie Decommissioning
  • ConocoPhillips - MacCulloch Decommisioning
  • Shell - L13 Remediation - Riser Installation
  • Talisman - 270 DSV IRM & Projects
  • Dong - ROVSV IRM Campaign
  • E.ON - Huntington OOS Survey
  • ConocoPhiliips - Murdoch Overtrawl Inspection
  • Chevron - Alder BOP Tether Unit Replacement
  • Total - Elgin Debris Inspection
  • Centrica - ROVSV IRM Campaign
  • Centrica - F3-08 Well Ops
  • ConocoPhillips - Brodgar Tie-in
  • GDF - Cygnus Spool Installation
  • Apache - Beryl Leak Rectification
  • Talisman - MacCulloch IRM Works
  • Maersk - 365 DSV IRM & Projects
  • ConocoPhillips - East Irish Sea & North Sea DSV Campaign

2014

  • Total - Total Yell Sound Survey Support
  • Maersk - DCC Riser Disconnection
  • Allseas - Total Laggan Pipeline Repair
  • Technip - GEAD Survey Support
  • BG Tunisia - Miskar IRM Intervention Works
  • ConocoPhillips - East Irish Sea Calder / Milliom Structure Inspection
  • E.ON - Huntington SCM Changeout
  • BP - Clair SSIV Repair
  • Centrica - ROVSV IRM Campaign
  • Dong - DSV IRM Campaign
  • Maersk - Dumbarton Pipeline Replacement
  • BG - Lomond Caisson Removal
  • Maersk - Tullich and Maclure Flowline Installation
  • Maersk - Dumbarton Pipeline Replacement
  • ConocoPhillips- Britannia Jumper & SCM Changeouts
  • ConocoPhillips - MacCulloch Isolations
  • ConocoPhillips - Joanne M11 Well Disconnection
  • BG - Blake DSV Campaign
  • ConocoPhillips - Callanish & Britannia Jumper Installations
  • Shell - Shell Pierce Riser Replacements
  • BP - Machar Diagnostics Project
  • TAQA - Cladhan Conductor Removals
  • Maersk - 365 DSV IRM & Projects
  • Talisman - 270 DSV IRM & Projects
  • Talisman - Arkwright Riser Replacement Project
  • Maersk Olie og Gas - Tyra Replacement Pipeline 28" Caisson Installation, Tie-in &  Precommissioning
  • Premier Oil - Solan Field Development CSV & DSV Installation & Tie-in Works
  • ConocoPhillips - Brodgar H3 Tree Remedial Works
  • ConocoPhillips - Judy Inspection &  Clamp Installation
  • Endeavour - Renee/Rubie Decommissioning Survey Works

2013

  • Maersk - Janice Flushing & Disconnection Works
  • Hess - FFFA Decommissioning Phase 5
  • E.ON - Huntington Flexible Riser & Dynamic Umbilical Installation (continued)
  • Maersk - Balloch P17 Tree Tie-in Works
  • Fairfield Energy - DSV IRM Campaign
  • Maersk - Maclure Gas Lift Flexible Recovery & IRM Works
  • Total - DSV IRM Campaign
  • Enquest - Thistle and Dons IRM Works
  • Centrica - East Irish Sea & North Sea DSV IRM Works
  • Maersk - Gryphon Area Reinstatement Programme
  • ConocoPhillips - M11 Tie-ins
  • Maersk - GP3 IRM, P27 Hydraulic Investigation & P35 Tullich Development Project
  • Hess - IVRR Decommissioning
  • E.ON - Johnston K Spool Installation & IRM Works
  • Maersk - Gryphon P36 Tie-Back
  • Maersk - Gryphon GP3 IRM
  • Nexen - Blackbird Scale Squeeze
  • Perenco - Leman Subsea Tie-ins & Precommissioning
  • Centrica - Mallard Scale Squeeze
  • E.ON - Hunter Metrology
  • Centrica – ROVSV IRM Campaign
  • Premier Oil - Solan & Brenda Umbilical Jumper Replacement
  • Nexen - ROVSV IRM Campaign
  • Talisman - 270 DSV IRM & Project Works

2012

  • Total - Nuggets Cluster Well Restart Project
  • Maersk - Lochranza P16 Tree Tie-in Works
  • Ithaca Energy - Athena Field Development
  • TAQA - Otter ESP Power Cable Works
  • Talisman - 270 DSV IRM & Project Works
  • Talisman - Arkwright Riser Replacement Project
  • Nexen - Ettrick & Scott DSV IRM Campaign
  • E.ON - Hunter Flowline Isolation
  • CNR - Lyell Water Injection Pipeline Reconnection & Replacement Works
  • Maersk - Janice Riser Reconfiguration
  • Teekay - Banff & Kyle Valve Isolation and Umbilical Preservation Works
  • Perenco - Arthur SCM Changeout
  • Maersk - Gryphon Area Reinstatement Programme
  • Hess - FFFA Decommissioning
  • Allseas - Breagh "A" Spool Installation & Tie-ins
  • Fairfield Energy - DSV IRM Campaign
  • Apache - Forties Delta to Forties Charlie Pipeline Replacement
  • ConocoPhillips - M10 Tie-ins
  • E.ON - Huntington Flexible Riser & Dynamic Umbilical Installation